Condensed extract from a real pre-purchase condition survey of a 19m wooden gulet, Bodrum, April 2026. Details anonymised.
Survey date: 14 April 2026. Location: Milta Marina, Bodrum. Survey type: Pre-purchase condition survey. Surveyor: Surveyyat - ABYC Professional Member.
Moisture readings of 94% WME at port garboard. Active seepage visible. Caulking has failed over 600mm. Recommend immediate re-caulking. Cost estimate: EUR 1,200-1,800.
Engine cooling intake seacock seized in open position. ABYC A-17 requires fully operational seacocks. Must not be used until replaced. Cost estimate: EUR 380-650.
Wire rigging from 2016 shows fatigue cracking at swage terminals. Recommend replacement within 12 months. Cost estimate: EUR 4,200-6,800.
Three circuits without ABYC overcurrent protection. Shore power inlet non-compliant. Full electrical review required. Cost estimate: EUR 1,800-3,200.
Moisture readings at 48 locations. 45 within acceptable range. Three elevated readings at forward bilge (32-38% WME) - monitor and re-survey after haulout.
Subject to A-class repairs: EUR 385,000-420,000. As surveyed: EUR 320,000-355,000. Survey findings support price adjustment of EUR 18,000-25,000 minimum.
Pre-purchase surveys from EUR 950 - ABYC Professional Member - Report in 3-5 days
Request a Survey Quote