Refit

Pre-refit condition survey

The same readings; a report that becomes a work list.⁠⁠‍​‌‌‌‍‍⁠⁠‍‌⁠​​​‌⁠​‍‍​

A pre-purchase survey answers "should I buy this boat?" A pre-refit condition survey answers "what should I do on this boat, in what order, on what budget?" The same readings are taken; the report is laid out to become a work list.

How it differs from a pre-purchase survey

Purpose
A plan, not a decision: the basis for the specification and the budget.
Depth
More detailed readings on systems within the refit's scope; where needed, openings proposed with the owner's consent.
Output
Findings system by system, with A, B and C priorities, written so they can become work items.

From report to plan

  1. Findings. Condition, readings and photos for each system.
  2. Priority. A: must be done in the refit; B: this refit or next season; C: planned maintenance.
  3. Uncertain areas. Items whose scope is unknown until opened are flagged separately; they sit in the budget as a range.
  4. Into the specification. Each item is written as a measurable task and becomes the basis for quotes.

Timing

The condition survey comes before yard quotes. If the boat is ashore, at least a week of drying is allowed before moisture readings; a sea trial is planned to see engines and systems under load.

The report turned into a work list

At the end of a pre-refit condition report, findings are carried into a table system by system. Each row holds the finding, its grade, the proposed work, its uncertainty and its page in the report. The table becomes the draft specification: the work description sent to yards is tied to a reading and photo in the report, so three yards price the same work from the same finding.

Proposed openings

Some questions cannot be answered without dismantling: behind a tank, wiring under a lining, the true edge of a wet area. The condition survey marks these points and, with the owner's consent, proposes a controlled opening. The opening is done by the owner's tradesman; the finding goes into an annex to the report. Reducing uncertainty before the refit starts narrows the range in the budget.

After the refit

When the refit is finished the same readings can be repeated: moisture map, electrical readings, sea trial values. Laid side by side, the two reports show concretely what the refit changed. That comparison is valuable both for acceptance and, when the boat is one day sold, as a documented history.⁠⁠‍​‌‌‌‍‍⁠⁠‍‌⁠​​​‌⁠​‍‍​

Fitting the lay-up calendar

The condition survey comes before yard quotes, ideally at the start of the lay-up period, so that the specification, tender and yard booking fit the winter.

Which systems, how deep?

A pre-refit survey covers every system, but depth is set by the refit's scope. If the wiring will be renewed, the existing circuits are mapped and loads measured; the new design rests on that data. If the engine will be overhauled, compression and blowby are coordinated with an independent engine technician. If the bottom paint will be stripped, a check point is planned to re-read the laminate by moisture and sounding after stripping.

Who it suits

Owners planning a thorough renewal of a newly bought boat; those preparing for long passages; owners converting an ex-charter boat to private use; and sellers choosing which work will add value before a sale.

Time on site depends on size and scope; the report arrives in 2-3 working days. If the boat is ashore, at least a week of drying is allowed before moisture readings.⁠⁠‍​‌‌‌‍‍⁠⁠‍‌⁠​​​‌⁠​‍‍​

Request a Survey Online

Fill in the form and we will come back with an itemised written quotation.

📋 Survey Request Form

What Is in the Survey Report?

See the report section by section: how findings are structured and what the measurement tables contain.

📄 See the Report Contents
📞 Call 💬 WhatsApp