Repair Quotation & Maintenance Contract Sample

A good repair quote does not start with a price. It starts with what will be done, by which method, to which standard.⁠⁠‍​‌‌‌‌‌​‍​‍⁠⁠⁠‌‍‌‌‍‍​

Repair disputes come from three places: unwritten extras, quietly substituted materials, and damage "found on opening". The sample below closes all three at quotation stage.

In short
  • A quote starts with purpose, a measurable outcome, included/excluded scope, method and standards.
  • Payment follows verified stages, not the calendar; part of the final payment is held until snags close.
  • Extras, material changes and subcontractors only with written approval.
  • Clauses protect both sides; one-sided wording is not honoured.

1. Sample Proposal

Tap a heading to open it; the first section starts open.

SAMPLE REPAIR QUOTATION

1. Particulars and parties
  • Quote number, date and validity (e.g. 30 days)
  • Contractor: legal name, tax number, address, responsible person
  • Owner: name, address, representative if any (surveyor/consultant)
  • Vessel: name, make and model, year, length, flag, berth or yard location
  • Annexes: specification, drawings, equipment list, photographed baseline
2. Purpose and expected outcome

Purpose: Structural repair of impact damage to the starboard bow and a safe return to service for the season.

Expected outcome: Laminate restored to original thickness and schedule; gelcoat colour-matched; moisture readings within the range of surrounding laminate; watertightness test passed.

The outcome is written so it can be measured; "in good condition" is not an outcome.

3. Scope: included, excluded, assumptions
ItemStatus
Cut out damaged laminate, scarf at least 1:12Included
Replace core (same type and density)Included
Re-laminate to original scheduleIncluded
Gelcoat, fairing, polishIncluded
Remove and refit interior liningIncluded
Haul-out, storage, launchExcluded, yard tariff
Further damage found on openingUnit rates, by variation

Assumptions: every assumption behind the price (access, existing condition, material availability) is written down. If one fails, a variation follows, not a surprise.

4. Method and standards

Damaged laminate is cut back to sound laminate with a scarf of at least 1:12. New plies go down in the original schedule and weights; the resin system (epoxy or vinylester) is chosen for compatibility with the existing laminate. Before laminating, dryness is confirmed by moisture readings.

Standard clauses

Competence, owner requirements, price structure, variation procedure, delay, disputes: these clauses are the same in every type of quote; their full text is in the refit proposal sample.

7. Process, programme and hold points
StageWork and hold pointTime
1Strip-out and opening, photographed baseline2 days
2Cut-out, scarf, drying and moisture readings3-5 days
3Laminating, inspection hold point before close-up2 days
4Gelcoat and finish2 days
5Water test, acceptance, snag list1 day

At a hold point work stops; it does not continue until the owner or their representative has seen it.

8. Tools, equipment and materials

A moisture meter and sounding hammer map the damage and check the repair afterwards. Resin, fabric, core and gelcoat are listed by make, model and batch number; the gelcoat code used for colour matching goes into the handover file.

11. Payment schedule

30% materials and start · 50% laminating complete and verified · 20% on acceptance (with retention)

Each payment depends on the stage being verified complete by photos and measurements.

12. Acceptance and handover
  • Acceptance criteria (readings, tests, sea-trial values)
  • Numbered, photographed snag list with close-out date
  • Documents: warranties, manuals, test records, drawings
13. Warranty

12 months on workmanship and materials; 24 months against delamination and water ingress. The warranty runs from acceptance. Response time for warranty work is stated.

14. Risk, insurance and title

If the damage is claimed on the hull policy, work does not start until the insurer's surveyor has seen the damage and approved the repair method. The insurer is told while the boat is at the yard and before hot work such as grinding. Which policy covers new damage found during the repair is stated.

2. Clauses Against Bad Faith and Abuse

The full list of clauses protecting owner and contractor, drawn from the disputes that recur most in the trade, is in the refit proposal sample. All of them apply to this type of quote too.⁠⁠‍​‌‌‌‌‌​‍​‍⁠⁠⁠‌‍‌‌‍‍​

Clauses Specific to a Repair

A repair usually starts with damage and time pressure. So the quote also states:

3. Adapting It to a Maintenance Contract

A periodic maintenance contract is the same set of clauses tied to a recurring schedule. On top of the repair clauses, it states:

4. Red Flags in a Quote

General warning signs for any quote are in the refit sample. In this type of quote, also watch for:

5. Working in Turkey: Local Practice

The full list of items Turkish yard and marina practice requires in a quote (currency and tax, stamp duty, yard charges, right of retention, contract for work) is in the refit proposal sample. For this type of document the key points are:

6. International References and Trade Practice

International references and trade practice are listed together in the refit proposal sample.

Let us read your quote with you

Send the quotation you have; we mark the missing clauses and the risks in writing.

💬 WhatsApp 📝 Written quote 📞 +90 501 5 SURVEY

Frequently asked questions

Fixed price or unit rates for a repair?

Visible work at a fixed price; work that may appear on opening at unit rates. All fixed and the yard prices in the risk; all hourly and the budget floats.

How do I handle damage "found on opening"?

Photographed notice, unit-rate pricing and a written variation. With a baseline survey on file, what is genuinely new is not in dispute. See damage survey .

Why ask for the removed parts?

The old part is the only proof that an invoiced part was actually replaced. This one clause heads off the most common abuse.

Do the same clauses apply to a maintenance contract?

Mostly. A periodic maintenance contract adds visit frequency, a task list per visit, a check report and response time for call-outs. The scope table in the refit proposal sample works as a template.

Request a Survey Online

Fill in the form and we will come back with an itemised written quotation.

📋 Survey Request Form

What Is in the Survey Report?

See the report section by section: how findings are structured and what the measurement tables contain.

📄 See the Report Contents
📞 Call 💬 WhatsApp