One question to answer before asking a yard for a price: what exactly do you want?⁠⁠‍​‌‍​‌‍⁠‍‍​‌​⁠‍‌⁠⁠⁠⁠​

Before asking a yard for a quotation there is one question to answer: what exactly do you want? If that answer is not in writing, none of the quotations you receive will be comparable, because each yard prices what it understood.

The technical specification is that answer, written down. It is the cheapest and most valuable intervention in any build or refit: every line written before signature costs less than the argument it prevents afterwards.

What a Specification Solves

Without oneWith one
Three quotations describe three different jobsThree quotations price the same job, comparably
"Quality generator", which one?Make, model, output, quantity and location in writing
"That wasn't included" surfaces mid-jobInclusions and exclusions known from the start
Expectations differ at handoverAcceptance criteria written and verified by measurement
Payment tied to the calendarPayment tied to stages and verification

What Goes In

Equipment schedule

At make-and-model level: main engine and gearbox, generator, air-conditioning, watermaker, stabilisers, windlass and winches, navigation electronics, battery bank and charging sources, safety equipment. Output, capacity and quantity for each.

Structure and materials

In composite, the laminate schedule, core material and thickness, resin system; in metal, plate thicknesses, profile list and welding procedure. For paint: manufacturer, coat count and dry film thickness.

System standards

Which standard the electrical installation follows, cable sizing calculation and protective arrangement; fuel line material; raw water circuit and seacock type; bonding schematic.⁠⁠‍​‌‍​‌‍⁠‍‍​‌​⁠‍‌⁠⁠⁠⁠​

Performance and weight

Light displacement commitment and tolerance; maximum and cruising speed at a stated load; fuel consumption. Without these three in writing there is nothing to measure, and nothing unmeasured can be claimed.

Acceptance criteria

What will have been achieved when the job is done: moisture value, thickness reading, continuity test, the figures to be reached on sea trial. A specification without acceptance criteria only defers the argument.

Commercial clauses

Stage-linked payment plan, independent verification condition, delay terms, warranty scope and period, variation procedure, title and insurance.⁠⁠‍​‌‍​‌‍⁠‍‍​‌​⁠‍‌⁠⁠⁠⁠​

How we work: we start by talking through what you need and how you will use the boat. We then write the specification; you and your lawyer review it. The document is yours, send it to any yard you choose. We take no part in that choice and no commission from any yard.

Who It Is For

Frequently Asked Questions

It can, but that specification defines what the yard intends to do, not what you want. The two usually overlap; where they do not is exactly what gets argued about later.
By scope. A few days for a refit scope, a few weeks for a full build specification. Most of that time goes into establishing what you actually need.
You do. Send it to any yard, and take as many quotations as you like.
If you want. It is a separate service, and it works best alongside the specification, because the quotations already sit on the same footing.

Related Pages

Let us write your specification

Tell us what you need and how you will use the boat. The document is yours, for any yard.

💬 WhatsApp 📝 Written quote 📞 +90 501 5 SURVEY

Request a Survey Online

Fill in the form and we will come back with an itemised written quotation.

📋 Survey Request Form

What Is in the Survey Report?

See the report section by section: how findings are structured and what the measurement tables contain.

📄 See the Report Contents
📞 Call 💬 WhatsApp