New-Build Proposal Sample

In a new build, money is paid before the product exists. Every clause should move that risk off your side of the table.⁠⁠‍​‌⁠‍‌⁠⁠‌‌‌⁠‍​⁠‌​‍‍⁠​

Three things matter most in a build contract: adherence to the specification, verified stage-linked payment, and who holds title and risk.

In short
  • A quote starts with purpose, a measurable outcome, included/excluded scope, method and standards.
  • Payment follows verified stages, not the calendar; part of the final payment is held until snags close.
  • Extras, material changes and subcontractors only with written approval.
  • Clauses protect both sides; one-sided wording is not honoured.

1. Sample Proposal

Tap a heading to open it; the first section starts open.

SAMPLE NEW-BUILD PROPOSAL

1. Particulars and parties
  • Quote number, date and validity (e.g. 30 days)
  • Contractor: legal name, tax number, address, responsible person
  • Owner: name, address, representative if any (surveyor/consultant)
  • Vessel: name, make and model, year, length, flag, berth or yard location
  • Annexes: specification, drawings, equipment list, photographed baseline
2. Purpose and expected outcome

Purpose: Build of a 14 m composite two-cabin cruising sailing yacht, design category B under ISO 12217.

Expected outcome: A yacht built to the attached specification and drawings; light displacement within ±5% (price reduction beyond it, rejection right past a set threshold); speed under power committed (e.g. at least 7.5 knots at 2,800 rpm, half load, calm water); acceptance criteria met; CE declaration and owner's manual delivered.

The outcome is written so it can be measured; "in good condition" is not an outcome.

3. Scope: included, excluded, assumptions
ItemStatus
Design, scantlings (ISO 12215), stability (ISO 12217)Included
Moulds, laminating, deck, interiorIncluded
Machinery, electrics, plumbing, fuel systemIncluded, specification annex
Rig and sailsIncluded, make/model in spec
CE conformity route and notified body feeIncluded
Navigation electronicsOption, priced separately
Delivery to handover portExcluded

Assumptions: every assumption behind the price (access, existing condition, material availability) is written down. If one fails, a variation follows, not a surprise.

4. Method and standards

Structure is calculated to ISO 12215 or the chosen class rules and attached with the laminate schedule. For composite, the production method (hand lay-up or infusion), resin system and shop temperature and humidity limits are stated; for metal, the welding procedure and welder qualification. Stability is shown to ISO 12217.

Standard clauses

Competence, owner requirements, price structure, variation procedure, delay, disputes: these clauses are the same in every type of quote; their full text is in the refit proposal sample.

7. Process, programme and hold points
StageWork and hold pointTime
1Contract, specification and drawing approvalMonth 0-1
2Moulds and hull laminate, thickness readingsMonth 2-5
3Structure and hull-deck joint, hold pointMonth 5-7
4Systems installation, hold pointMonth 7-10
5Machinery, drive and rigMonth 10-12
6Launch, sea trial, weighingMonth 12-13
7Acceptance, snag list, handoverMonth 13-14

At a hold point work stops; it does not continue until the owner or their representative has seen it.

8. Tools, equipment and materials

The materials list is tied to the specification's section numbers. Laminate thickness is measured on through-hull cut-outs; paint dry film thickness is recorded for every coat. Weight is tracked through the build by the weight estimate and verified after launch by weighing or an inclining test.

11. Payment schedule

30% on signing (against an advance-payment bank guarantee, or registration of the hull/materials in the owner's name) · 20% hull laminate verified · 15% hull-deck joint · 15% systems installed · 10% launch · 10% acceptance (half released when snags are closed)

Each payment depends on the stage being verified complete by photos and measurements.

12. Acceptance and handover
  • Acceptance criteria (readings, tests, sea-trial values)
  • Numbered, photographed snag list with close-out date
  • Documents: warranties, manuals, test records, drawings
13. Warranty

Systems and workmanship 24 months (the statutory minimum anyway where the buyer is a consumer); 3-5 years for hull structure and watertightness, negotiated separately; manufacturer-warranted equipment on maker's terms, coordinated by the yard. The warranty runs from acceptance. Response time for warranty work is stated.

14. Risk, insurance and title

The yard's construction insurance and sum insured for the boat and materials under construction are stated. When title passes is written plainly: registration in the register of ships under construction where the size allows, or minuted allocation of hull and materials to the owner. An advance-payment bank guarantee protects against the yard's financial difficulty.

2. Clauses Against Bad Faith and Abuse

The full list of clauses protecting owner and contractor, drawn from the disputes that recur most in the trade, is in the refit proposal sample. All of them apply to this type of quote too.⁠⁠‍​‌⁠‍‌⁠⁠‌‌‌⁠‍​⁠‌​‍‍⁠​

Clauses Specific to a New Build

Because payment comes before the boat exists, these clauses, absent from refit and repair quotes, are written into a build quote:

3. Red Flags in a Quote

General warning signs for any quote are in the refit sample. In this type of quote, also watch for:

4. Working in Turkey: Local Practice

The full list of items Turkish yard and marina practice requires in a quote (currency and tax, stamp duty, yard charges, right of retention, contract for work) is in the refit proposal sample. For this type of document the key points are:

5. International References and Trade Practice

International references and trade practice are listed together in the refit proposal sample.

Let us read your quote with you

Send the quotation you have; we mark the missing clauses and the risks in writing.

💬 WhatsApp 📝 Written quote 📞 +90 501 5 SURVEY

Frequently asked questions

How should build payments be structured?

By stage, not by date: hull laminate, hull-deck joint, systems, launch, acceptance. Independent verification at each stage; the deposit against a refund guarantee.

Should a new build guarantee speed?

Yes. Top and cruising speed for a motor yacht, speed under power for a sailing yacht, stated with loading condition, sea state, rpm and method. Reciprocal runs are averaged; a shortfall triggers stepped price reductions and, past a threshold, a right to reject. Fuel consumption (l/h) and cabin noise (dB(A)) can also be committed on motor yachts. Sailing performance depends on wind and is rarely guaranteed; the designer's velocity prediction (VPP) is attached for information.

Why does a weight commitment matter?

Excess weight permanently spoils trim, draft, speed and consumption and cannot be fixed at handover. Tolerance and consequences belong in the contract.

Who owns the boat under construction?

Whoever the contract says. If title and fire/damage risk at the yard are not written down, you find out at the worst moment.

Is there a sample specification?

Yes: the build specification sample . A quote should refer to the specification; without one, quotes cannot be compared.

Request a Survey Online

Fill in the form and we will come back with an itemised written quotation.

📋 Survey Request Form

What Is in the Survey Report?

See the report section by section: how findings are structured and what the measurement tables contain.

📄 See the Report Contents
📞 Call 💬 WhatsApp